Green Township Right of Way Permit
Driveway Apron, Pavement Opening, and Right-of-Way Excavation Permits
Jurisdiction and Where to Apply
Before applying for a permit, please note that not all roads within Green Township are Township-maintained.
Permit responsibility depends on which agency owns the roadway.
- Township Roads:
Typically, neighborhood and subdivision streets.
→ Permits issued by the Green Township Public Services Department
- County Roads:
Usually identified by a double yellow line down the center (e.g., Bridgetown Road, Ebenezer Road).
→ Contact the Hamilton County Engineer’s Office
- State Roads:
Include interstates and state routes (e.g., I-74, U.S. 50, S.R. 264).
→ Contact the Ohio Department of Transportation (ODOT)
If you are unsure which jurisdiction applies to your street, don't hesitate to get in touch with the Green Township Public Services Department at 513-574-8832 for assistance.
Permit Information
Cost: $50.00
No Cost for Utility Permits
To pay by credit card, please call 513-574-8832.
Basic Procedures and Specifications:
Driveway Apron Permits
Driveway Apron Section (Depth):
All apron improvements within the Township public right-of-way (R.O.W.) shall meet the following minimum requirements:
- Concrete: 7 inches minimum depth, Class C (4000 or 4500 Type), full-depth with no reinforcement steel. Expansion joint material must be placed adjacent to curbs and walks.
- Asphalt: 10 inches total (7" ± compacted B-19 stone base topped with 3" ODOT 404 asphalt).
Culvert Pipe Requirements:
If a culvert pipe is required for drainage, the minimum diameter is 12 inches.
All pipes must meet Hamilton County standards for right-of-way culvert pipe type and placement.
New Subdivisions:
All work must comply with Hamilton County Subdivision Standards for driveway apron location, configuration, slope, and sidewalk placement.
Inspection Requirements
Two inspections are required to complete the permit process.
Please contact the Assistant Director of Public Services at 513-574-8832 to schedule.
- Form Inspection:
After the existing driveway apron or soil has been removed to the required depth, forms are set. - Final Inspection:
After forms are stripped, the apron area is backfilled, and all disturbed soil has been seeded, mulched, or sodded.
Note: A 24-hour notice is required for all inspections.
If the permit holder does not request a final inspection within one (1) year of permit issuance, the permit will be nullified, and a new permit must be obtained.
Pipe Installation / Open Pavement
Material Specifications:
A 3-inch Schedule 40 pipe is required.
If a larger pipe is used, it must be reduced to fit the Township’s 3-inch connection.
Inspection Requirements:
- First Inspection: After the curb cut is made.
- Final Inspection: Before the pipe is covered.
Contact Information:
Green Township Public Services Department
Phone: 513-574-8832
Email: mainten@greentwp.org
Office Hours: Monday – Friday 7 am – 3 pm